OJO
NIA
OPERATING INSTRUCTIONS OZAT® CFS-6A
AIR OXYGEN
List of contents
1. General                       7
2. Product description 8
2.1 Technical data 9
2.1.1 Cabinet dimensions of the OZAT® ozone generator _____________________________________ 9
2.1.2 Nominal data of the OZAT® ozone generator __________________________________________ 9
2.1.3 Operational data of the OZAT® ozone generator _______________________________________ 10
2.2 Connection              11
2.2.1 Electrical data of the OZAT® ozone generator ________________________________________ 11
2.2.2 Mechanical connections of the OZAT® ozone generator ________________________________ 12
2.2.3 Dimensional drawing showing connections __________________________________________ 13
3. Safety measures and regulations _____________________________________________________ 15
3.1 Gaseous oxygen (if used as feedgas) _________________________________________________ 15
3.2 Ozone 16 3.2.1 Recommended protective measures and precautions __________________________________ 17
3.3 Electricity 18 3.3.1 Working on live equipment _______________________________________________________ 18
3.4 Mechanical dangers ______________________________________________________________ 18
3.4.1 Periodical maintenance _________________________________________________________ 18
3.5 First aid 19 3.5.1 First aid after exposure to ozone __________________________________________________ 19
3.6 Breathing apparatus ______________________________________________________________ 19
4. Construction and function ___________________________________________________________ 20
4.1 Scope of delivery and interface _______________________________________________________ 20
4.1.1 Ozonia delivery 20
4.1.2 Delivery limitations ____________________________________________________________ 20
4.2 Ambient monitoring for ozone ________________________________________________________ 22
5. Layout of the OZAT® ozone generator _________________________________________________ 23
5.1 Mechanical part 25
5.2 Electrical part 27
6. Operational and display elements and operational modes ________________________________ 28
6.1 Software versions and initialisation ____________________________________________________ 28
6.2 Selection of the displayed language ___________________________________________________ 29
6.3 Selection of the control location ______________________________________________________ 30
6.4 Ozone production 31
6.5 Functional sequence ______________________________________________________________ 32
6.5.1 Swich-on procedure ___________________________________________________________ 32
6.5.2 Switch-off procedure ___________________________________________________________ 33
6.6 Purging the system 34
6.7 EMERGENCY STOP circuit _________________________________________________________ 34
6.8 Switch-off following a fault (alarm) _____________________________________________________ 35
6.9 Acknowledging an alarm ___________________________________________________________ 36
7. Commissioning 37
7.1 Setting-up and installation __________________________________________________________ 37
7.1.1 Setting-up 37
7.1.2 Ambient conditions ____________________________________________________________ 37
7.1.3 Installation of the equipment and the piping __________________________________________ 38
7.1.4 Serto installation instructions ____________________________________________________ 38
7.1.5 Protection of lines _____________________________________________________________ 38
Rev.
Date: 98.08.19
Page 4 of 73
No. HTE 600 188